GGRAsia
When do casinos reopen? Opening date confirmed for Westcliff Genting Casino after long lockdown
Is Genting Open In Malaysia?
Genting Malaysia ready to reopen two of four properties
The facility remained closed until June 19.
Flamboro Downs will resume live racing in September.
Construction for the Resorts World Hyatt was managed by Plaza Construction, with design work performed by Perkins Eastman.